Contact Us/Report Outage: 507.451.7340 | Pay by Phone: 844.427.3417
Image
Building movers that will be bringing buildings through SWCE’s territory will need to provide to SWCE’s Operations Division the following items a minimum of two weeks prior to the building move.
- The route of the building move.
- The total height of the structure loaded on the trailer.
- The proposed date and time of the house move.
SWCE will provide the building mover with a cost estimate to accommodate the proposed building move. SWCE may require a deposit prior to the scheduled building move.